반응형
(kg/delay)
| 이격거리 / 진동속도 |
0.1 (cm/s) | 0.2 | 0.3 | 0.5 | 1 |
| 5 (m) | 0.00 | 0.00 | 0.01 | 0.01 | 0.03 |
| 10 | 0.01 | 0.02 | 0.03 | 0.06 | 0.13 |
| 15 | 0.02 | 0.04 | 0.07 | 0.13 | 0.30 |
| 20 | 0.03 | 0.07 | 0.12 | 0.22 | 0.53 |
| 25 | 0.05 | 0.11 | 0.18 | 0.35 | 0.83 |
| 30 | 0.07 | 0.16 | 0.27 | 0.50 | 1.20 |
| 40 | 0.12 | 0.28 | 0.47 | 0.89 | 2.13 |
| 50 | 0.19 | 0.44 | 0.74 | 1.40 | 3.32 |
| 60 | 0.27 | 0.64 | 1.06 | 2.01 | 4.79 |
| 70 | 0.37 | 0.87 | 1.45 | 2.74 | 6.51 |
| 80 | 0.48 | 1.14 | 1.89 | 3.58 | 8.51 |
| 90 | 0.61 | 1.44 | 2.39 | 4.53 | 10.77 |
| 100 | 0.75 | 1.78 | 2.95 | 5.59 | 13.30 |
| 110 | 0.90 | 2.15 | 3.57 | 6.76 | 16.09 |
| 120 | 1.08 | 2.56 | 4.25 | 8.05 | 19.15 |
| 130 | 1.26 | 3.01 | 4.99 | 9.45 | 22.47 |
| 140 | 1.47 | 3.49 | 5.79 | 10.96 | 26.06 |
| 150 | 1.68 | 4.00 | 6.64 | 12.58 | 29.92 |
| 160 | 1.91 | 4.55 | 7.56 | 14.31 | 34.04 |
| 170 | 2.16 | 5.14 | 8.53 | 16.16 | 38.42 |
| 180 | 2.42 | 5.76 | 9.56 | 18.11 | 43.08 |
| 190 | 2.70 | 6.42 | 10.66 | 20.18 | 48.00 |
| 200 | 2.99 | 7.11 | 11.81 | 22.36 | 53.18 |
| 220 | 3.62 | 8.61 | 14.29 | 27.06 | 64.35 |
| 240 | 4.31 | 10.24 | 17.00 | 32.20 | 76.58 |
| 260 | 5.05 | 12.02 | 19.96 | 37.79 | 89.88 |
| 280 | 5.86 | 13.94 | 23.14 | 43.83 | 104.24 |
| 300 | 6.73 | 16.00 | 26.57 | 50.31 | 119.66 |
| 350 | 9.16 | 21.78 | 36.16 | 68.48 | 162.87 |
| 400 | 11.96 | 28.45 | 47.23 | 89.44 | 212.73 |
| 450 | 15.14 | 36.01 | 59.78 | 113.20 | 269.24 |
| 500 | 18.69 | 44.46 | 73.80 | 139.75 | 332.39 |
(주)고려Nobel화약
발파기술지원, 발파공해에 의한 발파 환경 영향권 분석 발파 엔지니어링 사업
koryoexp.co.kr
반응형
'토공/가시설' 카테고리의 다른 글
| 노천 발파 공법 분류 기준 (0) | 2022.07.21 |
|---|---|
| 가시설 계측항목 및 계측빈도 (0) | 2022.06.30 |
| 차수공법 (SMI, SIG, SGJ, SGR, ASG, MSG, CSS, BGI) 비교 (0) | 2022.06.26 |
| 흙막이공법(토류판, 토류벽콘크리트, Sheet Pile, CIP, SCW, Slurry Wall) 비교 (0) | 2022.06.26 |
| BRD (Braket supported R/C Downward) 공법 설명 (1) | 2015.05.20 |